ELECTRA N°329 August 2023
Even though electricity storage is recognized as a prerequisite for the decarbonization of the power sector, the development of storage facilities is still facing legal/regulatory barriers and
Currently there is a growing interest for investments in storage facilities in Greece. Licensed projects mostly consist of Li-ion battery energy storage systems (BESS), either stand-alone or integrated in PVs, as well as PHS facilities .
The development of storage in Greece has only just begun: this year has been the big "kick-start" and there is now a common understanding of the needs and requirements and the steps to be taken to ensure an adequate identification and prioritization of all necessary actions.
The introduction and development of storage on Greece's islands that are that are not connected to the mainland power system is quite different, as it is currently only possible via hybrid stations (i.e. virtual production stations consisting of renewable energy resources and storage units operating as single distribution entities).
Considering the energy arbitrage and flexibility needs of the Greek power system, a mix of short (~2 MWh/MW) and longer (>6 MWh/MW) duration storages has been identified as optimal. In the short run, storage is primarily needed for balancing services and to a smaller degree for limited energy arbitrage.
PDF version includes complete article with source references. Suitable for printing and offline reading.
Download detailed specifications, case studies, and technical data sheets for our ESS containers and containerized PV systems.
15 Rue des Énergies Renouvelables
Paris 75015, France
+33 1 84 83 72 76
Monday - Friday: 8:30 AM - 6:30 PM CET